Affordable Access

Access to the full text

Geographic information system-based investment system for photovoltaic power plants location analysis in Turkey

Authors
  • Tercan, Emre1
  • Saracoglu, Burak Omer2
  • Bilgilioğlu, Süleyman Sefa3
  • Eymen, Abdurrahman4
  • Tapkın, Serkan5
  • 1 General Directorate of Highways, Antalya, 07090, Turkey , Antalya (Turkey)
  • 2 2 , Istanbul (Turkey)
  • 3 Aksaray University, Aksaray, 68100, Turkey , Aksaray (Turkey)
  • 4 Erciyes University, Kayseri, 38039, Turkey , Kayseri (Turkey)
  • 5 Antalya Bilim University, Antalya, 07190, Turkey , Antalya (Turkey)
Type
Published Article
Journal
Environmental Monitoring and Assessment
Publisher
Springer-Verlag
Publication Date
Apr 19, 2020
Volume
192
Issue
5
Identifiers
DOI: 10.1007/s10661-020-08267-5
Source
Springer Nature
Keywords
License
Yellow

Abstract

The motivation of this research, development, demonstration, deployment, and diffusion (RD3&D) study is to present the progress of designing the GIS-based location selection module of autonomous investment decision support system and its experimental application for photovoltaic power plants (PVPPs) in Antalya, Burdur, and Isparta planning region Turkey. The other motivation of this RD3&D study is to start investigating in combinations the applicability and usability of weighted linear combination with 4 subjective weighting approaches (rank sum weight method (RS), inverse or reciprocal weights method (RR), rank order centroid (ROC), point allocation (PA)) for 5 main criteria, 14 sub-criteria, and 79 value ranges. The results show that 38.48% of the planning region is unsuitable, 61.52% is suitable. Only 2.07% of this region is very highly suitable according to RS. 7.13%, 9.22%, and 5.58% are respectively very highly suitable according to RR, ROC, and PA. Similarities between RS, RR, ROC, and PA methods are presented such as RS-RR: 0.7834, RS-ROC: 0.8510, and RS-PA: 0.6384 with covariance and correlation analysis. A backward-looking performance verification and validation analysis is also performed with 7 PVPPs for only 4 decisive success factors (capacity factor, annual energy/land use, project cost/capacity, project cost/energy). This study is thus able to evaluate the optimal locations for future investments, as well as the suitability conditions of the available investments. This study will contribute to provide some useful recommendations for decision makers to identify and assess the hotspots which are suitable for PVPPs in the planning region.

Report this publication