E.ON awards pre-FEED contract for CO2capture plant

Journal
Pump Industry Analyst
1359-6128
Publisher
Elsevier
Publication Date
Volume
2009
Issue
7
Identifiers
DOI: 10.1016/s1359-6128(09)70274-5
Keywords
  • Market Prospects
Disciplines
  • Design
  • Engineering

Abstract

A consortium including Foster Wheeler Energy Ltd and Mitsubishi Heavy Industries Ltd (MHI) has entered into a technical services agreement with E.ON UK plc to perform the pre-front-end engineering design (pre-FEED) for a post-combustion carbon dioxide (CO 2) capture plant proposed as part of E.ON's new supercritical coal-fired power station in Kent, UK.