Determination Of The Energy Production Potential, The Cost Analysis And The Payback Period For A Wind Power Plant Planned To Be Constructed In The Terkos Region, Istanbul
- Authors
- Publication Date
- Jan 01, 2010
- Source
- Ulusal Üniversitelerarası Açık Erişim Sistemi - İstanbul Teknik Üniversitesi
- Keywords
- License
- Unknown
- External links
Abstract
M.Sc.