Affordable Access

Publisher Website

Emerging solution of large-scale unit commitment problem by Stochastic Priority List

Authors
Journal
Electric Power Systems Research
0378-7796
Publisher
Elsevier
Publication Date
Volume
76
Issue
5
Identifiers
DOI: 10.1016/j.epsr.2005.07.002
Keywords
  • Gray Zone
  • Heuristic
  • Probability Distribution
  • Stochastic Priority
  • Unit Commitment
  • Window System
Disciplines
  • Economics
  • Mathematics

Abstract

Abstract This paper presents a new approach for unit commitment problem using Stochastic Priority List method. In this method, rapidly some initial unit commitment schedules are generated by Priority List method and priority based stochastic window system. Excess units are added with system dependent probability distribution to avoid overlooking a desired solution during repeated search. Constraints are not considered in this stage. Then schedules are modified gradually using the problem specific heuristics to fulfill constraints. To reduce calculations, heuristics are applied only to the solutions, which can be expected to improve. Besides, sign vector is introduced to reduce economic load dispatch (ELD) overhead recalculations. This process is repeated for optimal solution. The proposed method is tested using the reported problem data set. Simulation results for the systems up to 100-unit are compared to previous reported results. Numerical results show an improvement in solution cost and time compared to the results obtained from Genetic Algorithm and others.

There are no comments yet on this publication. Be the first to share your thoughts.