Affordable Access

Publisher Website

The ITER neutral beam test facility: Designs of the general infrastructure, cryosystem and cooling plant

Authors
Journal
Fusion Engineering and Design
0920-3796
Publisher
Elsevier
Publication Date
Volume
74
Identifiers
DOI: 10.1016/j.fusengdes.2005.06.114
Keywords
  • Iter
  • Neutral Beam
  • Facility
  • Infrastructure
Disciplines
  • Design

Abstract

Abstract The CEA Association is involved, in close collaboration with ENEA, FZK, IPP and UKAEA European Associations, in the first ITER neutral beam (NB) injector and the ITER neutral beam test facility design (EFDA task ref. TW3-THHN-IITF1). A total power of about 50 MW will have to be removed in steady state on the neutral beam test facility (NBTF). The main purpose of this task is to make progress with the detailed design of the first ITER NB injector and to start the conceptual design of the ITER NBTF. The general infrastructure layout of a generic site for the NBTF includes the test facility itself equipped with a dedicated beamline vessel [P.L. Zaccaria, et al., Maintenance schemes for the ITER neutral beam test facility, this conference] and integration studies of associated auxiliaries such as cooling plant, cryoplant and forepumping system.

There are no comments yet on this publication. Be the first to share your thoughts.

Statistics

Seen <100 times
0 Comments