Heuristic for Task-Worker Assignment with Varying Learning Slopes

Authors
Publisher
Faculty of Engineering, Chulalongkorn University
Keywords
  • Industrial Engineering
  • Heuristic
  • Learning Ability.
  • Task-Worker Assignment

Abstract

Fashion industry has variety products, so the multi-skilled workers are required to improve flexibility in production and assignment. Generally the supervisor will assign task to the workers based on skill and skill levels of worker. Since in fashion industry new product styles are launched more frequently and the order size tends to be smaller, the workers always learn when the raw material and the production process changes. Consequently they require less time to produce the succeeding units of a task based on their learning ability. Since the workers have both experience and inexperience workers, so each worker has different skill level and learning ability. Consequently, the assignment which assumed constant skill level is not proper to use. This paper proposes a task-worker assignment considering worker skill levels and learning abilities. Processing time of each worker changes along production period due to a worker learning ability. We focus on a task-worker assignment in a fashion industry where tasks are ordered in series; the number of tasks is greater than the number of workers. Therefore, workers can perform multiple assignments followed the precedence restriction as an assembly line balancing problem. The problem is formulated in an integer linear programming model with objective to minimize makespan. A heuristic is proposed to determine the lower bound (LB) and the upper bound (UB) of the problem and the best assignment is determined. The performance of the heuristic method is tested by comparing quality of solution and computational time to optimal solutions.

There are no comments yet on this publication. Be the first to share your thoughts.

Statistics

Seen <100 times
Downloaded <100 times
0 Comments

More articles like this

A two-stage heuristic for multi-activity and task...

on Computers & Industrial Enginee...

Heuristic task assignment for distributed computin...

on Information Sciences Jan 01, 1992

On the Task Assignment Problem: Two New Efficient...

on Journal of Parallel and Distri... Jan 01, 1997

Work allocation to stations with varying learning...

on European Journal of Operationa... Jan 01, 2008
More articles like this..